Railway bridge at km 59+159, on railway Stara Pazova – Novi Sad, is new viaduct, from tunnel Čortanovci to Sremski Karlovci. Viaduct is placed right beside Danube river bank, on floodable ground.

Bridges are designed for train speed max 200 km/h.

Viaduct structures (each of them, one for left and the other for right train direction) are divided in eight smaller structures, named Gallery, A, B, IB1, C, IB2, D and E, with lengths 40 + 618 + 644 + 50 + 644 + 50 + 644 + 223 m ≈ 2.913 m (total).

Max dilatation length is 644 / 2 = 322 m.

Total length of all structures is cca 5.800 m.

Structures are founded on piles, 1419 piles total, each pile 30 m long.