Bridge is a part of the Zrenjanin interchange, bypass around Novi Sad, E75, Lot 1.1, bridge length 100m, three traffic lanes for each direction. Exit of Novi Sad towards Zrenjanin, over the E75. Precast prestressed girders, continuous over the piers. Preliminary and Final Design.