As a part of the route of E-75 highway , section Kelebija – Subotica Jug interchange, 5 structures were designed (every structure has two parallel bridges)
1. Bridge on highway E-57 (Y-section) over the rail road
Baja – Subotica, km 6+286.00
Two parallel road-pedestrian bridges. Bridges are placed over the rail tracks, with spans 15 + 25 + 15 m, total length of structures is 55 m. Total width of one bridge is 14.2 m. Bridges were founded on piles, and superstucture is prefabricated.
2. Bridge at the interchange of highway E-75 and Gornji Tavankut road km 9+617.08
Two parallel road-pedestrian bridges. Bridges have three spans 10 m + 16 m + 10 m, total length of structures is 46 m (with wing walls). Total width of one bridge is 14.2 m. Bridges were founded on piles, and superstucture is prefabricated.
3. Bridge on highway E-57 (Y-section) over the rail road
Sombor – Subotica, km 10+140.36
Two parallel road-pedestrian bridges. Bridges are placed over the rail tracks, with spans 15 + 25 + 15 m, total length of structures is 55 m. Total width of one bridge is 14.2 m. Bridges were founded on piles, and superstucture is prefabricated.
4. Bridge on highway E-57 (Y-section) over the rail road
Subotica – Novi Sad, km 19+269.10
Two parallel road-pedestrian bridges. Bridges are placed over the rail tracks, with spans 20.3 + 30 + 20.3 m, total length of structures is 70.6 m. Total width of one bridge is 14.2 m. Bridges were founded on piles, and superstucture is prefabricated.
5. Bridge at the interchange of highway E-75 and Subotica-Čantavir local road km 19+607.83
Two parallel road-pedestrian bridges. Bridges have three spans 10 m + 16 m + 10 m, total length of structures is 46 m (with wing walls). Total width of one bridge is 14.2 m. Bridges were founded on piles, and superstucture is prefabricated.